Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  6-CLD Troncs Express



General information  
Place Morzine 
resort Portes du Soleil 
Region Rhône-Alpes 
Country   
Name of lift Troncs Express 
Type 6-CLD 
Lift manufacturer Poma 
Year of construction 2012 
Commissioning date 21 Dec 2012 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 1324 m
Height of middle station(s) ?? m
Height of mountain station 1589 m
Vertical rise 265 m
Route distance 765 m
Horizontal length 740 m
Average incline 35,81 %
Largest incline 59 %
Number of pillars 7 Stk
Greatest spanwidth 155, m
Max ground clearance 19 m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2400 Pers/h
Travel time 2,31 min
Driving speed line 5,5 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Siemens 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) 533 kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive diesel engine 
Traction of emergency drive hydrostatic 

cabins data  
Grip type ?? 
Cab manufacturer Poma 
Cab model ?? 
Seating leather 
Seat heater no 
Persons per cab
Number of cabs 36 Stk
Cab distance 49,5 m
Cab interval 9 s
Garage type ?? 
Garage place ?? 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer Tréfileurope 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime winter 
Situation of entrance parallel 
Situation of exit 90° 
Loading carpet no 
Evacuation ropeway no 
Integrated rescue system ?? 
Rope position control ?? 
Autonomous ropeway no 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 25 May 2025
PHOTOS: ??

Lift-Statistics
6210 visit(s) since 3 Nov 2012
Last visit 3 Jul 2025

LIFT-WORLD IDs
Lift-ID: 16087
Place-ID: 1145

https://www.seilbahntechnik.net/en/lifts/16087/datas.htm