Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  10-MGD Providência



General information  
Place Rio de Janeiro 
resort Sugar Loaf 
Region Rio de Janeiro 
Country   
Name of lift Providência 
Type 10-MGD 
Lift manufacturer Doppelmayr 
Year of construction 2012 
Commissioning date 2 Jul 2014 
Date of closing down 17 Dec 2016 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 13 m
Height of middle station(s) 83 m
Height of mountain station 14 m
Vertical rise 1 m
Route distance 721 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 9 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 6,10 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 3000 Pers/h
Travel time 4,5 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type A108 
Cab manufacturer CWA 
Cab model OMEGA IV-8 LWI 
Seating duckboard (timber) 
Seat heater no 
Heater ?? 
Aircon ?? 
Persons per cab 10 
Number of cabs 16 Stk
Cab distance ?? m
Cab interval 9,6 s
Garage type ground floor 
Garage place mountain station 
Garage direction backward 
Loading direction forward 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Mountain station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction right 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime ??  
Evacuation ropeway ?? 
Integrated rescue system ?? 
Rope position control ?? 
Autonomous ropeway no 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 11 Dec 2023
PHOTOS: ??

Lift-Statistics
5280 visit(s) since 26 Apr 2013
Last visit 16 Feb 2026

LIFT-WORLD IDs
Lift-ID: 16685
Place-ID: 122

https://www.seilbahntechnik.net/en/lifts/16685/datas.htm