Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  4-CLF Hexenexpress

Valley - first operation day
Valley - first operation day

Entry situation with conveyor
Entry situation with conveyor

Valley station view to top
Valley station view to top

General information  
Place Braunlage 
resort Skicentrum am Brande 
Region Lower Saxony 
Country   
Name of lift Hexenexpress 
Type 4-CLF 
Lift manufacturer Leitner 
Year of construction 2013 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 726 m
Height of mountain station 969 m
Vertical rise 243 m
Route distance 995 m
Horizontal length 960 m
Average incline 25,9 %
Largest incline ?? %
Number of pillars 8 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 4,9 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1806 Pers/h
Travel time 7,2 min
Driving speed line 2,3 m/s

electrical data  
Electrical control Leitner 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive 1 Stk
Drive power (Start) 205 kW
Drive power (Operation) 142 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Leitner 
Cab model ?? 
Seating Icolan 
Seat heater no 
Persons per cab
Number of cabs 111 Stk
Cab distance 18,34 m
Cab interval 7,97 s


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 42 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction left 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime ❄ ☀ all-season 
Loading carpet yes 
Evacuation ropeway no 
Integrated rescue system no 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 12.07.2023
PHOTOS: ??

Lift-Statistics
12503 visit(s) since 12.10.2013
Last visit 21.04.2025

LIFT-WORLD IDs
Lift-ID: 16936
Place-ID: 15

https://www.seilbahntechnik.net/en/lifts/16936/datas.htm