Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  2-CLF Myšák

Valley Station
Valley Station

Line
Line

Mountain Station
Mountain Station

General information  
Place ?? 
resort ?? 
Region Moravskoslezský kraj 
Country   
Name of lift Myšák 
Type 2-CLF 
Lift manufacturer Garaventa 
Year of construction 2013 
Commissioning date ?? 
Date of closing down 2018 
Date of pull down 2018 
Second-hand lift. Formerly lift no. 1835 


Infos for handicapped persons
Sorry, no information available.

Characteristics
second-hand Lift from Rougemont (former Rubloz-Les Gouilles), Switzerland

geometric data  
Height of valley station 688 m
Height of mountain station 838 m
Vertical rise 150 m
Route distance 555 m
Horizontal length 533 m
Average incline 28,09 %
Largest incline 53,40 %
Number of pillars 7 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1240 Pers/h
Travel time 4,0 min
Driving speed line 2,3 m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) 110 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type ?? 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Garaventa 
Cab model ?? 
Seating Icolan 
Seat heater no 
Persons per cab
Number of cabs 85 Stk
Cab distance 13,3 m
Cab interval 5,8 s


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 32 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type rope tension weight 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 25 %
Drive direction left 
Construction costs ?? CZK
Currency (Construction costs) Czech koruna 
Construction period ?? months
Seasontime winter 
Loading carpet yes 
Evacuation ropeway ?? 
Integrated rescue system ?? 
Autonomous ropeway no 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 2 Apr 2023
PHOTOS: ??

Lift-Statistics
6650 visit(s) since 12 Dec 2013
Last visit 16 Jun 2025

LIFT-WORLD IDs
Lift-ID: 17109
Place-ID: 2089

https://www.seilbahntechnik.net/en/lifts/17109/datas.htm