Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  150-AT Piz Val Gronda Bahn










General information  
Place Ischgl 
resort Snow Card Tirol 
Region Tyrol 
Country   
Name of lift Piz Val Gronda Bahn 
Type 150-AT 
Lift manufacturer Doppelmayr 
Year of construction 2013 
Commissioning date 20/12/13 


Infos for handicapped persons
Sorry, no information available.

Characteristics
First aerial tramway with seat heating!

geometric data  
Height of valley station 2295 m
Height of mountain station 2812 m
Vertical rise 517 m
Route distance 2452 m
Horizontal length 2380 m
Average incline 21,8 %
Largest incline 51,5 %
Number of pillars 2 Stk
Greatest spanwidth 1602 m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) 540 °
Drive altitude of site ?? m
Maximum capacity 1300 Pers/h
Travel time 5,4 min
Driving speed line 12 m/s
Speed on towers 7 m/s

electrical data  
Electrical control Siemens 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive 2 Stk
Drive power (Start) 1820 kW
Drive power (Operation) 620 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive diesel engine 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer CWA 
Cab model KRONOS 
Heater yes 
Aircon no 
Persons per cab 150 
Number of cabs 2 Stk
Carriage Operator no 


rope data  
Rope manufacturer Fatzer 
Length of carrying rope ?? m
Length of traction rope ?? m
Length of counter-rope ?? m
Total weight of carrying rope ?? t
Total weight of traction rope ?? t
Total weight of counter-rope ?? t
Carrying rope diameter 72 mm
Traction rope diameter 47 mm
Counter-rope diameter ?? mm
Nominal strength of carrying rope ?? N/mm²
Nominal strength of traction rope ?? N/mm²
Nominal strength of counter-rope ?? N/mm²
Breaking strength of carrying rope ?? kN
Breaking strength of traction rope ?? kN
Breaking strength of counter-rope ?? kN
Tensionstation carryingrope ?? 
Tensionstation tractionrope Mountain station 
Tension type rope tension weight 
Tension way 9 m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Construction costs ?? EUR
Currency (Construction costs) Euro 
Construction period 8 months
Seasontime winter 
xxxx hier text hin xxxx no 
Moving platform no 
Evacuation ropeway no 
Integrated rescue system ?? 
Asset number (Trail map) E5 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 27/04/23
PHOTOS: ??

Lift-Statistics
25995 visit(s) since 12/12/13
Last visit 19/03/24

LIFT-WORLD IDs
Lift-ID: 17118
Place-ID: 2

https://www.seilbahntechnik.net/en/lifts/17118/datas.htm