Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  4-CLD Grand Plan

Valley Station
Valley Station

Line
Line

Mountain Station
Mountain Station

General information  
Place Sainte-Foy-Tarentaise 
resort ?? 
Region Rhône-Alpes 
Country   
Name of lift Grand Plan 
Type 4-CLD 
Lift manufacturer Doppelmayr 
Year of construction 2013 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 1515 m
Height of mountain station 1773 m
Vertical rise 258 m
Route distance 820 m
Horizontal length 790 m
Average incline 35 %
Largest incline 69 %
Number of pillars 8 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 5,2 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2000 Pers/h
Travel time 3,3 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control SEIREL 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) 290 kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type A104C 
Cab manufacturer Doppelmayr 
Cab model ?? 
Seating ?? 
Seat heater no 
Persons per cab
Number of cabs 50 Stk
Cab distance 36 m
Cab interval 7,2 s
Garage type ?? 
Garage place ?? 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer ArcelorMittal 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 41 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 50 %
Drive direction left 
Construction costs ?? EUR
Currency (Construction costs) Euro 
Construction period 6 months
Seasontime winter 
Situation of entrance 90° 
Situation of exit parallel 
Loading carpet no 
Evacuation ropeway no 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 9 juil. 2023
PHOTOS: ??

Lift-Statistics
3894 visit(s) since 31 déc. 2013
Last visit 9 mai 2025

LIFT-WORLD IDs
Lift-ID: 17169
Place-ID: 1210

https://www.seilbahntechnik.net/en/lifts/17169/datas.htm