Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  6-CLD l'Ecrin

Valley Station
Valley Station

Line
Line

Mountain Station
Mountain Station

General information  
Place Chamrousse 
resort ?? 
Region Rhône-Alpes 
Country   
Name of lift l'Ecrin 
Type 6-CLD 
Lift manufacturer Poma 
Year of construction 2005 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 1733 m
Height of middle station(s) ?? m
Height of mountain station 2033 m
Vertical rise 287 m
Route distance 1746 m
Horizontal length 1719 m
Average incline 17,01 %
Largest incline 51 %
Number of pillars 17 Stk
Greatest spanwidth 148 m
Max ground clearance 14 m
Trackwidth drive 4,0 m
Trackwidth line ?? m
Trackwidth return 4,9 m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 3000 Pers/h
Travel time ?? min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Semer 
Remote control and telemonitoring system Semer 
Power control system Semer 
Number of drive ?? Stk
Drive power (Start) 516 kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type Omega T 
Cab manufacturer Poma 
Cab model ?? 
Seating leather 
Seat heater no 
Persons per cab
Number of cabs 106 Stk
Cab distance 35 m
Cab interval 7 s
Garage type ground floor 
Garage place mountain station 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer Tréfileurope 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 46 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 25 %
Drive direction left 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime ??  
Situation of entrance 90° 
Situation of exit parallel 
Loading carpet no 
Evacuation ropeway no 
Integrated rescue system no 
Rope position control ?? 
Autonomous ropeway no 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: Aug 23, 2025
PHOTOS: ??

Lift-Statistics
6072 visit(s) since Feb 12, 2014
Last visit Sep 1, 2025

LIFT-WORLD IDs
Lift-ID: 17204
Place-ID: 990

https://www.seilbahntechnik.net/en/lifts/17204/datas.htm