Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  4-MGD Wankbahn II

Line (2013)
Line (2013)

General information  
Place Garmisch-Partenkirchen 
resort Zugspitze 
Region Bavaria 
Country   
Name of lift Wankbahn II 
Type 4-MGD 
Lift manufacturer PWH 
Year of construction 1982 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 1175 m
Height of mountain station 1762 m
Vertical rise 587 m
Route distance 1450 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 13 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1200 Pers/h
Travel time 20 min
Driving speed line 4,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Elin 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive 1 Stk
Drive power (Start) ?? kW
Drive power (Operation) 300 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station 
Drive type electrical 
Traction of drive direct drive 
Emergency drive diesel engine 
Traction of emergency drive mechanical 

cabins data  
Grip type ?? 
Cab manufacturer De Giorgi 
Cab model ?? 
Seating none 
Seat heater no 
Heater ?? 
Aircon ?? 
Persons per cab
Number of cabs 135 Stk
Cab distance 48 m
Cab interval 12 s
Garage type ground floor 
Garage place valley and mountain 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 36 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Mountain station 
Tension type rope tension weight 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction right 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime summer 
Evacuation ropeway ?? 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 20/01/23
PHOTOS: ??

Lift-Statistics
8840 visit(s) since 26/06/14
Last visit 29/03/24

LIFT-WORLD IDs
Lift-ID: 17340
Place-ID: 157

https://www.seilbahntechnik.net/en/lifts/17340/datas.htm