Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  4-CLF Hääggen - Glogghüs (Glogghüs 2)




Valley station
Valley station

Line
Line

General information  
Place Meiringen-Hasliberg 
resort ?? 
Region Berne 
Country   
Name of lift Hääggen - Glogghüs (Glogghüs 2) 
Type 4-CLF 
Lift manufacturer Garaventa 
Year of construction 1992 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 2010 m
Height of middle station(s) ?? m
Height of mountain station 2437 m
Vertical rise 427 m
Route distance 1013 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars ?? Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1000 Pers/h
Travel time 7 min
Driving speed line 2,3 m/s

electrical data  
Electrical control Frey 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive 1 Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive diesel engine 
Traction of emergency drive mechanical 

cabins data  
Grip type ?? 
Cab manufacturer Garaventa 
Cab model 4E95 
Seating Icolan 
Seat heater no 
Persons per cab
Number of cabs 63 Stk
Cab distance ?? m
Cab interval ?? s


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulically (fix) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left 
Construction costs ?? CHF
Currency (Construction costs) Swiss franc 
Construction period ?? months
Seasontime winter 
Loading carpet no 
Evacuation ropeway no 
Integrated rescue system ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 31/07/22
PHOTOS: ??

Lift-Statistics
9492 visit(s) since 12/03/05
Last visit 23/12/24

LIFT-WORLD IDs
Lift-ID: 1743
Place-ID: 175

https://www.seilbahntechnik.net/en/lifts/1743/datas.htm