Lift-Database » Lifts in the world
6-CLD Tschein

Valley Station

Mountain Station

Line
General information | |
---|---|
Place | Welschnofen |
resort | Dolomiti Superski |
Region | Trentino-South Tyrol |
Country | ![]() |
Name of lift | Tschein |
Type | 6-CLD |
Lift manufacturer | Leitner |
Year of construction | 2014/20 |
Commissioning date | ?? |
Infos for handicapped persons |
---|
Sorry, no information available. |
Characteristics |
---|
route extension in 2020 |
geometric data | |
---|---|
Height of valley station | 1572 m |
Height of mountain station | 1981 m |
Vertical rise | 409 m |
Route distance | 2204 m |
Horizontal length | ?? m |
Average incline | ?? % |
Largest incline | ?? % |
Number of pillars | 16 Stk |
Greatest spanwidth | ?? m |
Max ground clearance | ?? m |
Trackwidth drive | ?? m |
Trackwidth line | ?? m |
Trackwidth return | ?? m |
Angle of wrap (drive wheel) | ?? ° |
Drive altitude of site | ?? m |
Maximum capacity | 1600 (2000) Pers/h |
Travel time | 6 min |
Driving speed line | 5,0 m/s |
Driving speed station | ?? m/s |
electrical data | |
---|---|
Electrical control | Leitner |
Remote control and telemonitoring system | ?? |
Power control system | ?? |
Number of drive | 1 Stk |
Drive power (Start) | ?? kW |
Drive power (Operation) | 441 kW |
Brake power | ?? kW |
Continuous brake power | ?? kW |
Driving station | Mountain station |
Drive type | electrical |
Traction of drive | direct drive |
Emergency drive | ?? |
Traction of emergency drive | ?? |
cabins data | |
---|---|
Grip type | LPA |
Cab manufacturer | Leitner |
Cab model | ?? |
Seating | leather |
Seat heater | no |
Persons per cab | 6 |
Number of cabs | 74 Stk |
Cab distance | ?? m |
Cab interval | ?? s |
Garage type | ground floor |
Garage place | mountain station |
Garage direction | backward |
Loading direction | forward |
rope data | |
---|---|
Rope manufacturer | ?? |
Length of haul rope | ?? m |
Total weight of haul rope | ?? t |
Haul rope diameter | 44 mm |
Nominal strength of haul rope | ?? N/mm² |
Breaking strength of rope | ?? kN |
Tensionstation haulrope | Valley station |
Tension type | hydraulical (controlled) |
Tension way | ?? m |
miscellaneous data | |
---|---|
Transport uphill | 100 % |
Transport downhill | ?? % |
Drive direction | left |
Construction costs | ?? EUR |
Currency (Construction costs) | Euro |
Construction period | 5 months |
Seasontime | ❄ winter |
Situation of entrance | ?? |
Situation of exit | parallel |
Loading carpet | no |
Evacuation ropeway | ?? |
Integrated rescue system | ?? |
Rope position control | ?? |
Asset number (Trail map) | 404 |
Updates
Datas: 19 dic 2021
PHOTOS: ??
Lift-Statistics
14791 visit(s) since 16 nov 2014
Last visit 4 apr 2025
LIFT-WORLD IDs
Lift-ID: 17695
Place-ID: 1662
https://www.seilbahntechnik.net/en/lifts/17695/datas.htm
Datas: 19 dic 2021
PHOTOS: ??
Lift-Statistics
14791 visit(s) since 16 nov 2014
Last visit 4 apr 2025
LIFT-WORLD IDs
Lift-ID: 17695
Place-ID: 1662
https://www.seilbahntechnik.net/en/lifts/17695/datas.htm