Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  6-CLD Plan du Repos

Valley Station
Valley Station

Line
Line

Mountain Station
Mountain Station

General information  
Place La Rosière 
resort Espace San Bernardo 
Region Rhône-Alpes 
Country   
Name of lift Plan du Repos 
Type 6-CLD 
Lift manufacturer Poma 
Year of construction 2014 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 1857 m
Height of middle station(s) ?? m
Height of mountain station 2333 m
Vertical rise 476 m
Route distance 1741 m
Horizontal length 1699 m
Average incline 27,34 %
Largest incline 46 %
Number of pillars 16 Stk
Greatest spanwidth 178 m
Max ground clearance 17 m
Trackwidth drive 4,9 m
Trackwidth line 6,1 m
Trackwidth return 4,9 m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 3000 Pers/h
Travel time 5,28 min
Driving speed line 5,5 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Semer 
Remote control and telemonitoring system Semer 
Power control system Semer 
Number of drive ?? Stk
Drive power (Start) 553 kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type LPA 
Cab manufacturer Poma 
Cab model ?? 
Seating leather 
Seat heater no 
Persons per cab
Number of cabs 88 Stk
Cab distance ?? m
Cab interval ?? s
Garage type ?? 
Garage place ?? 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer ArcelorMittal 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 46 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 17 %
Drive direction left 
Construction costs ?? EUR
Currency (Construction costs) Euro 
Construction period ?? months
Seasontime winter 
Situation of entrance parallel 
Situation of exit parallel 
Loading carpet no 
Evacuation ropeway no 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 01/07/23
PHOTOS: ??

Lift-Statistics
6793 visit(s) since 07/12/14
Last visit 29/03/24

LIFT-WORLD IDs
Lift-ID: 17748
Place-ID: 1066

https://www.seilbahntechnik.net/en/lifts/17748/datas.htm