Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


2-CLF Bichlalm


Valley Station
Valley Station

Line
Line

Mountain Station
Mountain Station


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

General information  
Place Kitzbuehel
resort Kitzbuehel


Region Tyrol, Tirol
Country AT Austria, Österreich
Name of lift Bichlalm 
Type 2-CLF 
Lift manufacturer Leitner 
Year of construction 2014 
Commissioning date 23/05/14

geometric data  
Height of valley station 904,00 m
Height of middle station(s) 1158,50 m
Height of mountain station 1597,00 m
Vertical rise 693 m
Route distance 2255 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 18 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 400 Pers/h
Travel time 15 min
Driving speed line 2,5 m/s

rope data  
Rope manufacturer ??
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control ??
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) 108 kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type electrical
Traction of drive electromechanical
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type ??
Cab manufacturer Leitner
Cab model ??
Seating leather
Seat heater no
Persons per cab
Number of cabs 101 Stk
Cab distance ?? m
Cab interval ?? s

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction right
Construction costs ??  EUR 
Currency (Construction costs) Euro 
Construction period ?? months
Seasontime ❄ ☀ all-season
Loading carpet no
Evacuation ropeway no
Integrated rescue system no
Asset number (Trail map) ?? 




This information are for members only visible!





Support
Wrong data or something is missing?
Support us!
Updates
Datas: 22/04/20 22:06:04
PHOTOS: 03/10/15 14:08:27

Lift-Statistics
15241 visit(s) since 06/06/15
Last visit 05/08/20

LIFT-WORLD IDs
Lift-ID: 17923
Place-ID: 51

https://www.seilbahntechnik.net/en/lifts/17923/datas.htm