Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  4-MGD Castillo de Montjuich







Cablecar above a sea of houses
Cablecar above a sea of houses

General information  
Place Barcelona 
resort ?? 
Region Catalonia 
Country   
Name of lift Castillo de Montjuich 
Type 4-MGD 
Lift manufacturer von Roll 
Year of construction 1969 
Commissioning date ?? 
Date of closing down 2006 
Date of pull down 2007 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Middle-Station

geometric data  
Height of valley station 85 m
Height of middle station(s) ?? m
Height of mountain station 186 m
Vertical rise 99 m
Route distance 815 m
Horizontal length ?? m
Average incline 12 %
Largest incline ?? %
Number of pillars ?? Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1200 Pers/h
Travel time 5,5 min
Driving speed line 2,5 m/s
Driving speed station ?? m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station ?? 
Drive type ?? 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type VR101 
Cab manufacturer CWA 
Cab model ?? 
Seating ?? 
Seat heater no 
Heater ?? 
Aircon ?? 
Persons per cab
Number of cabs 54 Stk
Cab distance ?? m
Cab interval ?? s
Garage type ?? 
Garage place ?? 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope ?? 
Tension type rope tension weight 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction ?? 
Construction costs ?? ESP
Currency (Construction costs) Spanish peseta 
Construction period ?? months
Seasontime ❄ ☀ all-season 
Evacuation ropeway ?? 
Integrated rescue system ?? 
Rope position control ?? 
Autonomous ropeway no 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 11 mei 2023
PHOTOS: ??

Lift-Statistics
3467 visit(s) since 11 mrt 2005
Last visit 4 jun 2025

LIFT-WORLD IDs
Lift-ID: 1794
Place-ID: 2532

https://www.seilbahntechnik.net/en/lifts/1794/datas.htm