Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


6-CLD Arabba Fly


Mountain station
Mountain station

Valley station
Valley station

Line
Line


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

General information  
Place Arabba
resort Dolomiti Superski
Region Veneto
Country IT Italy, Italia
Name of lift Arabba Fly 
Type 6-CLD 
Lift manufacturer Leitner 
Year of construction 2015 
Commissioning date 25/12/15

geometric data  
Height of valley station 1643 m
Height of mountain station 1674 m
Vertical rise 31 m
Route distance 427 m
Horizontal length 425,12 m
Average incline ?? %
Largest incline ?? %
Number of pillars 5 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 6,1 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2650 Pers/h
Travel time 1,25 min
Driving speed line 5 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer ??
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 38 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Mountain station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control ??
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) 160 kW
Drive power (Operation) 135 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type electrical
Traction of drive electromechanical
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type ??
Cab manufacturer ??
Cab model ??
Seating leather
Seat heater ??
Persons per cab
Number of cabs 26 Stk
Cab distance 40,75 m
Cab interval 8,15 s
Garage type ??
Garage place ??
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction right
Construction costs ??  ?? 
Currency (Construction costs) ?? 
Construction period 2,5 months
Seasontime winter
Situation of entrance parallel
Situation of exit parallel
Loading carpet ??
Evacuation ropeway yes
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 30/01/16 16:04:55
PHOTOS: 02/04/16 15:52:16

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
6104 visit(s) since 04/12/15
Last visit 20/11/19

LIFT-WORLD IDs
Lift-ID: 18027
Place-ID: 1292

https://www.seilbahntechnik.net/en/lifts/18027/datas.htm