Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  6/8-CGD Riederalp-Blausee

Middle Station
Middle Station

Line
Line

General information  
Place Riederalp 
resort Aletsch Arena 
Region Valais 
Country   
Name of lift Riederalp-Blausee 
Type 6/8-CGD 
Lift manufacturer Doppelmayr 
Year of construction 2015 
Commissioning date 05/12/15 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

geometric data  
Height of valley station 1884 m
Height of mountain station 2206 m
Vertical rise 322 m
Route distance 1083 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 10 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2400 Pers/h
Travel time ?? min
Driving speed line 5 m/s
Driving speed station ?? m/s

electrical data  
Electrical control SISAG 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) 396 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station ?? 
Drive type electrical 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer ?? 
Cab model ?? 
Bubble colour blue 
Seating ?? 
Seat heater no 
Persons per cab 6/8 
Number of cabs 68 (18) Stk
Cab distance ?? m
Cab interval ?? s
Garage type ground floor 
Garage place valley station 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope ?? 
Tension type ?? 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right 
Construction costs ?? CHF
Currency (Construction costs) Swiss franc 
Construction period ?? months
Seasontime ❄ ☀ all-season 
Situation of entrance ?? 
Situation of exit ?? 
Loading carpet yes 
Evacuation ropeway ?? 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map)

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 16/05/21
PHOTOS: ??

Lift-Statistics
5636 visit(s) since 22/10/16
Last visit 22/11/24

LIFT-WORLD IDs
Lift-ID: 18153
Place-ID: 2105

https://www.seilbahntechnik.net/en/lifts/18153/datas.htm