Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  8-CLD/B Schmiedingerbahn

Line
Line

Valley Station
Valley Station

Mountain Station
Mountain Station

General information  
Place Kaprun 
resort Lechnerberg 
Region Salzburg 
Country   
Name of lift Schmiedingerbahn 
Type 8-CLD/B 
Lift manufacturer Doppelmayr 
Year of construction 2016 
Commissioning date 24/11/16 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

geometric data  
Height of valley station 2534 m
Height of mountain station 2775 m
Vertical rise 241 m
Route distance 721 m
Horizontal length 678 m
Average incline 35,47 %
Largest incline ?? %
Number of pillars 6 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 7,3 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2900 Pers/h
Travel time 2,82 min
Driving speed line 5 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Doppelmayr 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) 443 kW
Drive power (Operation) 362 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station 
Drive type electrical 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type DT 108 
Cab manufacturer Doppelmayr 
Cab model 8E98/B 
Bubble colour neutral 
Seating leather 
Seat heater yes 
Persons per cab
Number of cabs 34 Stk
Cab distance 49,66 m
Cab interval 9,93 s
Garage type station circulation 
Garage place valley station 
Garage direction forward 
Loading direction forward 


rope data  
Rope manufacturer Fatzer 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 48 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left 
Construction costs ?? EUR
Currency (Construction costs) Euro 
Construction period 5 months
Seasontime winter 
Situation of entrance 90° 
Situation of exit 90° 
Loading carpet no 
Evacuation ropeway no 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 25/01/22
PHOTOS: ??

Lift-Statistics
16479 visit(s) since 26/11/16
Last visit 30/12/24

LIFT-WORLD IDs
Lift-ID: 18187
Place-ID: 5

https://www.seilbahntechnik.net/en/lifts/18187/datas.htm