Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  8-CLD/B Flimjochbahn

Line
Line

Mountain Station
Mountain Station

Valley Station
Valley Station

General information  
Place Ischgl 
resort Snow Card Tirol 
Region Tyrol 
Country   
Name of lift Flimjochbahn 
Type 8-CLD/B 
Lift manufacturer Doppelmayr 
Year of construction 2016 
Commissioning date 2016 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Tower 3 was shared with tower 9 of the Höllbodenbahn.

geometric data  
Height of valley station 2298 m
Height of mountain station 2752 m
Vertical rise 454 m
Route distance 1797 m
Horizontal length 1724 m
Average incline 26 %
Largest incline 62 %
Number of pillars 16 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive 6,1 m
Trackwidth line 7,3 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 3200 Pers/h
Travel time 6,5 min
Driving speed line 5 m/s
Driving speed station 1 m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive 2 Stk
Drive power (Start) 898 kW
Drive power (Operation) 681 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive diesel engine 
Traction of emergency drive mechanical 

cabins data  
Grip type A108C 
Cab manufacturer Doppelmayr 
Cab model CS10 
Bubble colour neutral 
Seating leather 
Seat heater yes 
Persons per cab
Number of cabs 87 Stk
Cab distance 45 m
Cab interval 9 s
Garage type underground 
Garage place valley station 
Garage direction forward 
Loading direction forward 


rope data  
Rope manufacturer Fatzer 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 52 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 50 %
Drive direction right 
Construction costs ?? EUR
Currency (Construction costs) Euro 
Construction period 7 months
Seasontime ❄ ☀ all-season 
Situation of entrance parallel 
Situation of exit parallel 
Loading carpet yes 
Evacuation ropeway no 
Integrated rescue system ?? 
Rope position control yes 
Asset number (Trail map) B2 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 08/02/23
PHOTOS: ??

Lift-Statistics
22618 visit(s) since 26/11/16
Last visit 19/03/24

LIFT-WORLD IDs
Lift-ID: 18188
Place-ID: 2

https://www.seilbahntechnik.net/en/lifts/18188/datas.htm