Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  10-MGD 12er Express

Mountain Station
Mountain Station

Complete View of the lift
Complete View of the lift

Line
Line

General information  
Place Hinterglemm 
resort Ski Alpin Card 
Region Salzburg 
Country   
Name of lift 12er Express 
Type 10-MGD 
Lift manufacturer Doppelmayr 
Year of construction 2016 
Commissioning date 02/12/16 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Shortest detachable gondola worldwide

geometric data  
Height of valley station 1073 m
Height of mountain station 1100 m
Vertical rise 27 m
Route distance 236 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 3 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 6,40 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2400 Pers/h
Travel time 1 min
Driving speed line 4 m/s
Driving speed station ?? m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station ?? 
Drive type ?? 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type D5000 
Cab manufacturer CWA 
Cab model Omega IV-10 SI D 
Seating leather 
Seat heater ?? 
Heater ?? 
Aircon ?? 
Persons per cab 10 
Number of cabs 15 Stk
Cab distance ?? m
Cab interval ?? s
Garage type station circulation 
Garage place valley and mountain 
Garage direction forward 
Loading direction forward 


rope data  
Rope manufacturer Fatzer 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 48 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope ?? 
Tension type ?? 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction ?? 
Construction costs ?? EUR
Currency (Construction costs) Euro 
Construction period ?? months
Seasontime winter 
Evacuation ropeway no 
Integrated rescue system ?? 
Rope position control yes 
Asset number (Trail map) B3 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 17/04/24
PHOTOS: ??

Lift-Statistics
12199 visit(s) since 02/07/17
Last visit 30/12/24

LIFT-WORLD IDs
Lift-ID: 18379
Place-ID: 343

https://www.seilbahntechnik.net/en/lifts/18379/datas.htm