Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  10-MGD Waldalm










General information  
Place Rauris 
resort ?? 
Region Salzburg 
Country   
Name of lift Waldalm 
Type 10-MGD 
Lift manufacturer Doppelmayr 
Year of construction 2016/17 
Commissioning date 10/01/17 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 1270 m
Height of mountain station 1840 m
Vertical rise 570 m
Route distance 2034 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 13 Stk
Greatest spanwidth ?? m
Max ground clearance 32 m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2017 Pers/h
Travel time 7 min
Driving speed line 6 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Frey Austria 
Remote control and telemonitoring system Frey Austria 
Power control system Frey Austria 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Carvatech 
Cab model CS10 
Seating ?? 
Seat heater no 
Heater no 
Aircon no 
Persons per cab 10 
Number of cabs 34 Stk
Cab distance ?? m
Cab interval ?? s
Garage type ground floor 
Garage place valley station 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 52 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope ?? 
Tension type ?? 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction left 
Construction costs ?? EUR
Currency (Construction costs) Euro 
Construction period 6,3 months
Seasontime winter 
Evacuation ropeway ?? 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map)

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 23/01/22
PHOTOS: ??

Lift-Statistics
10125 visit(s) since 01/11/17
Last visit 29/03/24

LIFT-WORLD IDs
Lift-ID: 18413
Place-ID: 255

https://www.seilbahntechnik.net/en/lifts/18413/datas.htm