Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  10-MGD Eichenhofbahn 1

Line
Line

Cabin
Cabin

Valley Station
Valley Station

General information  
Place St. Johann in Tirol 
resort ?? 
Region Tyrol 
Country   
Name of lift Eichenhofbahn 1 
Type 10-MGD 
Lift manufacturer Leitner 
Year of construction 2017 
Commissioning date 16/12/17 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 688 m
Height of mountain station 819 m
Vertical rise 131 m
Route distance 960 m
Horizontal length ?? m
Average incline 14 %
Largest incline 20,1 %
Number of pillars 8 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) 180 °
Drive altitude of site ?? m
Maximum capacity 1800 Pers/h
Travel time 3,3 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) 294 kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station ?? 
Drive type electrical 
Traction of drive direct drive 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Sigma 
Cab model DIAMOND - C10D210 
Seating carpet 
Seat heater no 
Heater no 
Aircon no 
Persons per cab 10 
Number of cabs 24 Stk
Cab distance ?? m
Cab interval ?? s
Garage type station circulation 
Garage place valley and mountain 
Garage direction forward 
Loading direction forward 


rope data  
Rope manufacturer Teufelberger 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope ?? 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction right 
Construction costs ?? EUR
Currency (Construction costs) Euro 
Construction period ?? months
Seasontime winter 
Evacuation ropeway no 
Integrated rescue system no 
Rope position control ?? 
Asset number (Trail map) E1 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 07/07/23
PHOTOS: ??

Lift-Statistics
16778 visit(s) since 26/11/17
Last visit 18/03/24

LIFT-WORLD IDs
Lift-ID: 18455
Place-ID: 344

https://www.seilbahntechnik.net/en/lifts/18455/datas.htm