Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  10-MGD Reischlbergbahn










General information  
Place Klaffer am Hochficht 
resort ?? 
Region Upper Austria 
Country   
Name of lift Reischlbergbahn 
Type 10-MGD 
Lift manufacturer Leitner 
Year of construction 2017 
Commissioning date 12 / 2017 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Austria's nothernmost mountain station
Mountain station is located 50m from Czech Republic

geometric data  
Height of valley station 934 m
Height of middle station(s) 1020 m
Height of mountain station 1278 m
Vertical rise 344 m
Route distance 1367 m
Horizontal length 1419 m
Average incline ?? %
Largest incline ?? %
Number of pillars 14 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 6,10 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2800 Pers/h
Travel time 2,94 min
Driving speed line 6,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Leitner 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) 926 kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Middle station 
Drive type electrical 
Traction of drive direct drive 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Sigma 
Cab model DIAMOND - C10D210 
Seating carpet 
Seat heater no 
Heater no 
Aircon no 
Persons per cab 10 
Number of cabs 56 Stk
Cab distance 77,14 m
Cab interval 12,85 s
Garage type ground floor 
Garage place Middle station(s) 
Garage direction forward 
Loading direction forward 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 48 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope ?? 
Tension type ?? 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 50 %
Drive direction left 
Construction costs ?? EUR
Currency (Construction costs) Euro 
Construction period 7 months
Seasontime winter 
Evacuation ropeway no 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 09/12/23
PHOTOS: ??

Lift-Statistics
8279 visit(s) since 18/02/18
Last visit 14/10/24

LIFT-WORLD IDs
Lift-ID: 18515
Place-ID: 3816

https://www.seilbahntechnik.net/en/lifts/18515/datas.htm