Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  10-MGD Schlossalmbahn I







General information  
Place Bad Hofgastein 
resort ?? 
Region Salzburg 
Country   
Name of lift Schlossalmbahn I 
Type 10-MGD 
Lift manufacturer Doppelmayr 
Year of construction 2017/18 
Commissioning date 01/12/18 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

geometric data  
Height of valley station 852 m
Height of mountain station 1307 m
Vertical rise 455 m
Route distance 1274,72 m
Horizontal length 1190,64 m
Average incline 38,24 %
Largest incline ?? %
Number of pillars 8 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive 5 m
Trackwidth line 6,2 m
Trackwidth return 6,2 m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 3015 Pers/h
Travel time 3,70 min
Driving speed line 6,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Doppelmayr 
Remote control and telemonitoring system Doppelmayr 
Power control system Doppelmayr 
Number of drive 1 Stk
Drive power (Start) 726 kW
Drive power (Operation) 569 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive diesel engine 
Traction of emergency drive hydrostatic 

cabins data  
Grip type A104C 
Cab manufacturer CWA 
Cab model Omega IV-10 SI D 
Seating leather 
Seat heater yes 
Heater no 
Aircon no 
Persons per cab 10 
Number of cabs 50 Stk
Cab distance 71,64 m
Cab interval 11,94 s
Garage type ground floor 
Garage place valley station 
Garage direction forward 
Loading direction forward 


rope data  
Rope manufacturer Fatzer 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 56 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way 6 m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction left 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period 6 months
Seasontime ❄ ☀ all-season 
Evacuation ropeway no 
Integrated rescue system yes 
Rope position control yes 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 27/01/22
PHOTOS: ??

Lift-Statistics
9441 visit(s) since 07/12/18
Last visit 30/12/24

LIFT-WORLD IDs
Lift-ID: 18683
Place-ID: 245

https://www.seilbahntechnik.net/en/lifts/18683/datas.htm