Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


8-MGD Aineck Silverjet I












Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

General information  
Place Katschberghoehe
resort Katschberg
Region Carinthia, Kärnten
Country AT Austria, Österreich
Name of lift Aineck Silverjet I 
Type 8-MGD 
Lift manufacturer Doppelmayr 
Year of construction 2018 
Commissioning date 01/12/18

geometric data  
Height of valley station 1072 m
Height of mountain station 1552 m
Vertical rise 480 m
Route distance 1672 m
Horizontal length ?? m
Average incline 30,04 %
Largest incline ?? %
Number of pillars 10 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2600 Pers/h
Travel time 5,56 min
Driving speed line 6 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer Teufelberger 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 48 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control Doppelmayr 
Remote control and telemonitoring system Doppelmayr 
Power control system Doppelmayr 
Number of drive 1 Stk
Drive power (Start) 676 kW
Drive power (Operation) 535 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type electrical
Traction of drive electromechanical
Emergency drive diesel engine
Traction of emergency drive hydrostatic

cabins data  
Grip type DT 108
Cab manufacturer CWA
Cab model OMEGA IV-8
Seating leather
Seat heater yes
Heater no
Aircon no
Persons per cab
Number of cabs 60 Stk
Cab distance ?? m
Cab interval ?? s
Garage type ground floor
Garage place mountain station
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction right
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period 6 months
Seasontime winter
Evacuation ropeway no
Integrated rescue system no
Rope position control yes
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 10/04/19 12:16:16
PHOTOS: 01/01/19 18:50:04

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
1379 visit(s) since 09/12/18
Last visit 21/07/19

LIFT-WORLD IDs
Lift-ID: 18688
Place-ID: 82

https://www.seilbahntechnik.net/en/lifts/18688/datas.htm