Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  10-MGD MK Maiskogelbahn










General information  
Place Kaprun 
resort Lechnerberg 
Region Salzburg 
Country   
Name of lift MK Maiskogelbahn 
Type 10-MGD 
Lift manufacturer Leitner 
Year of construction 2018 
Commissioning date 2018 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

geometric data  
Height of valley station 768 m
Height of mountain station 1570 m
Vertical rise 802 m
Route distance 3811 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 27 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2800 Pers/h
Travel time 12 min
Driving speed line 6 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Leitner 
Remote control and telemonitoring system Leitner 
Power control system Leitner 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) 1714 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Middle station 
Drive type electrical 
Traction of drive direct drive 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type LPA 
Cab manufacturer Sigma 
Cab model DIAMOND - C10D210 
Seating carpet 
Seat heater no 
Heater no 
Aircon no 
Persons per cab 10 
Number of cabs 123 Stk
Cab distance ?? m
Cab interval ?? s
Garage type ground floor 
Garage place mountain station 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope ?? 
Tension type ?? 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction right 
Construction costs ?? EUR
Currency (Construction costs) Euro 
Construction period ?? months
Seasontime ❄ ☀ all-season 
Evacuation ropeway no 
Integrated rescue system no 
Rope position control no 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 04/02/23
PHOTOS: ??

Lift-Statistics
8635 visit(s) since 27/12/18
Last visit 29/03/24

LIFT-WORLD IDs
Lift-ID: 18767
Place-ID: 5

https://www.seilbahntechnik.net/en/lifts/18767/datas.htm