Lift-Database » Lifts in the world
3-CLF Ramées
Valley station
Line
Mountain station
General information | |
---|---|
Place | Méribel-Mottaret |
resort | Les Trois Vallées |
Region | Rhône-Alpes |
Country | |
Name of lift | Ramées |
Type | 3-CLF |
Lift manufacturer | Poma |
Year of construction | 1977 |
Commissioning date | 1977 |
Date of closing down | 2008 |
Date of pull down | 2008 |
Infos for handicapped persons |
---|
Sorry, no information available. |
Characteristics |
---|
nothing |
geometric data | |
---|---|
Height of valley station | 1696 m |
Height of mountain station | 2196 m |
Vertical rise | 500 m |
Route distance | 1435 m |
Horizontal length | ?? m |
Average incline | 36 % |
Largest incline | 64 % |
Number of pillars | 13 Stk |
Greatest spanwidth | ?? m |
Max ground clearance | ?? m |
Trackwidth drive | ?? m |
Trackwidth line | ?? m |
Trackwidth return | ?? m |
Angle of wrap (drive wheel) | ?? ° |
Drive altitude of site | ?? m |
Maximum capacity | 1150 Pers/h |
Travel time | 10,4 min |
Driving speed line | 2,3 m/s |
electrical data | |
---|---|
Electrical control | ?? |
Remote control and telemonitoring system | ?? |
Power control system | ?? |
Number of drive | ?? Stk |
Drive power (Start) | ?? kW |
Drive power (Operation) | ?? kW |
Brake power | ?? kW |
Continuous brake power | ?? kW |
Driving station | Valley station |
Drive type | electrical |
Traction of drive | electromechanical |
Emergency drive | ?? |
Traction of emergency drive | ?? |
cabins data | |
---|---|
Grip type | ?? |
Cab manufacturer | Poma |
Cab model | ?? |
Seating | leather |
Seat heater | no |
Persons per cab | 3 |
Number of cabs | ?? Stk |
Cab distance | 12,7 m |
Cab interval | 5,54 s |
rope data | |
---|---|
Rope manufacturer | ?? |
Length of haul rope | ?? m |
Total weight of haul rope | ?? t |
Haul rope diameter | ?? mm |
Nominal strength of haul rope | ?? N/mm² |
Breaking strength of rope | ?? kN |
Tensionstation haulrope | Valley station |
Tension type | hydraulical (controlled) |
Tension way | ?? m |
miscellaneous data | |
---|---|
Transport uphill | 100 % |
Transport downhill | ?? % |
Drive direction | left |
Construction costs | ?? |
Currency (Construction costs) | ?? |
Construction period | ?? months |
Seasontime | ❄ winter |
Loading carpet | no |
Evacuation ropeway | no |
Integrated rescue system | no |
Asset number (Trail map) | ?? |
Updates
Datas: 20/11/23
PHOTOS: ??
Lift-Statistics
7759 visit(s) since 19/03/05
Last visit 22/11/24
LIFT-WORLD IDs
Lift-ID: 1888
Place-ID: 1131
https://www.seilbahntechnik.net/en/lifts/1888/datas.htm
Datas: 20/11/23
PHOTOS: ??
Lift-Statistics
7759 visit(s) since 19/03/05
Last visit 22/11/24
LIFT-WORLD IDs
Lift-ID: 1888
Place-ID: 1131
https://www.seilbahntechnik.net/en/lifts/1888/datas.htm