Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


8/10-CGD Zinsberg


Valley Station
Valley Station

Line
Line

Mountain Station
Mountain Station


Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

General information  
Place Brixen im Thale
resort

SkiWelt
Region Tyrol, Tirol
Country AT Austria, Österreich
Name of lift Zinsberg 
Type 8/10-CGD 
Lift manufacturer Doppelmayr 
Year of construction 2019 
Commissioning date 2019

geometric data  
Height of valley station 1280 m
Height of mountain station 1667 m
Vertical rise 378 m
Route distance 1844 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars ?? Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 7,70 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 3434 Pers/h
Travel time 5,67 min
Driving speed line 6,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer Teufelberger 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 51 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope ??
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control ??
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station ??
Drive type electrical
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type D5000
Cab manufacturer Doppelmayr
Cab model DCD 8
Bubble colour blue
Seating leather
Seat heater yes
Persons per cab 8/10 
Number of cabs 80 Stk
Cab distance ?? m
Cab interval ?? s
Garage type ground floor
Garage place mountain station
Garage direction forward
Loading direction backward

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right
Construction costs 15,500,000  EUR 
Currency (Construction costs) Euro 
Construction period 8 months
Seasontime ❄ ☀ all-season
Situation of entrance ??
Situation of exit ??
Loading carpet ??
Evacuation ropeway no
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!





Support
Wrong data or something is missing?
Support us!
Updates
Datas: 25/05/20 15:17:28
PHOTOS: 25/12/19 13:56:42

Lift-Statistics
2099 visit(s) since 23/11/19
Last visit 04/08/20

LIFT-WORLD IDs
Lift-ID: 19008
Place-ID: 73

https://www.seilbahntechnik.net/en/lifts/19008/datas.htm