Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


10-MGD Hochsölden-Rotkogl





Infos for handicapped persons
Sorry, no information available.

Characteristics
Middle station on uphill site only

General information  
Place Soelden
resort White 5
Region Tyrol, Tirol
Country AT Austria, Österreich
Name of lift Hochsölden-Rotkogl 
Type 10-MGD 
Lift manufacturer Doppelmayr 
Year of construction 2019 
Commissioning date 22/11/19

geometric data  
Height of valley station 1938 m
Height of middle station(s) 2094 m
Height of mountain station 2291 m
Vertical rise 353 m
Route distance 1197 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars ?? Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) 180 °
Drive altitude of site ?? m
Maximum capacity 800/1330 Pers/h
Travel time 5,76 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer ??
Length of haul rope 2455 m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope ??
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control ??
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station ??
Drive type electrical
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type ??
Cab manufacturer CWA
Cab model ??
Seating ??
Seat heater no
Heater no
Aircon no
Persons per cab 10 
Number of cabs 14 (23) Stk
Cab distance ?? m
Cab interval ?? s
Garage type ground floor
Garage place valley station
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction left
Construction costs 10.000.000  EUR 
Currency (Construction costs) Euro 
Construction period 5 months
Seasontime ❄ ☀ all-season
Evacuation ropeway no
Integrated rescue system no
Rope position control ??
Asset number (Trail map) C38 




This information are for members only visible!



Updates
Datas: 24/11/19 12:18:57
PHOTOS: ????

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
91 visit(s) since 24/11/19
Last visit 06/12/19

LIFT-WORLD IDs
Lift-ID: 19012
Place-ID: 1

https://www.seilbahntechnik.net/en/lifts/19012/datas.htm