Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


10-MGD Fleckalm





Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

General information  
Place Kirchberg
resort Kitzbuehel
Region Tyrol, Tirol
Country AT Austria, Österreich
Name of lift Fleckalm 
Type 10-MGD 
Lift manufacturer Leitner 
Year of construction 2019 
Commissioning date 06/12/19

geometric data  
Height of valley station 814 m
Height of mountain station 1801 m
Vertical rise 987 m
Route distance 4071 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 22 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2590 Pers/h
Travel time 9,7 min
Driving speed line 7 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer Teufelberger 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 60 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope ??
Tension type ??
Tension way ?? m

electrical data  
Electrical control ??
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station ??
Drive type ??
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type ??
Cab manufacturer Leitner
Cab model CS10
Seating ??
Seat heater ??
Heater ??
Aircon ??
Persons per cab 10 
Number of cabs 96 Stk
Cab distance ?? m
Cab interval ?? s
Garage type ??
Garage place valley and mountain
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction ??
Construction costs 27.500.000  EUR 
Currency (Construction costs) Euro 
Construction period 8 months
Seasontime ??
Evacuation ropeway ??
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 01/12/19 15:30:01
PHOTOS: ????

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
36 visit(s) since 01/12/19
Last visit 05/12/19

LIFT-WORLD IDs
Lift-ID: 19015
Place-ID: 55

https://www.seilbahntechnik.net/en/lifts/19015/datas.htm