Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


6-CLD/B Velilleck





Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

General information  
Place Ischgl
resort Silvretta Arena

Region Tyrol, Tirol
Country AT Austria, Österreich
Name of lift Velilleck 
Type 6-CLD/B 
Lift manufacturer Doppelmayr 
Year of construction 2019 
Commissioning date 30/11/19

geometric data  
Height of valley station 2048 m
Height of mountain station 2620 m
Vertical rise 572 m
Route distance 1948 m
Horizontal length ?? m
Average incline 31 %
Largest incline 75 %
Number of pillars 16 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2400 Pers/h
Travel time 5,92 min
Driving speed line 6 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer Teufelberger 
Length of haul rope ?? m
Total weight of haul rope 37 t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope ??
Tension type ??
Tension way ?? m

electrical data  
Electrical control Frey Austria 
Remote control and telemonitoring system Frey Austria 
Power control system Frey Austria 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) 661 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type ??
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type ??
Cab manufacturer Doppelmayr
Cab model ??
Bubble colour neutral
Seating ??
Seat heater yes
Persons per cab
Number of cabs 79 Stk
Cab distance ?? m
Cab interval ?? s
Garage type underground
Garage place valley station
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right
Construction costs 13.500.000  EUR 
Currency (Construction costs) Euro 
Construction period 8 months
Seasontime winter
Situation of entrance ??
Situation of exit ??
Loading carpet yes
Evacuation ropeway ??
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) F1 




This information are for members only visible!



Updates
Datas: 01/12/19 15:44:11
PHOTOS: ????

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
32 visit(s) since 01/12/19
Last visit 06/12/19

LIFT-WORLD IDs
Lift-ID: 19017
Place-ID: 2

https://www.seilbahntechnik.net/en/lifts/19017/datas.htm