Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


8-CLD/B SenderExpress


Entrance
Entrance

Exit
Exit

Mountain Station
Mountain Station


Infos for handicapped persons
Sorry, no information available.

Characteristics
Loading conveyor adjusts in height automatically.
Doppelmayr Direct Drive

General information  
Place Lofer
resort Loferer Alm
Region Salzburg
Country AT Austria, Österreich
Name of lift SenderExpress 
Type 8-CLD/B 
Lift manufacturer Doppelmayr 
Year of construction 2019 
Commissioning date 14/12/19

geometric data  
Height of valley station 1322 m
Height of mountain station 1622 m
Vertical rise 284 m
Route distance 1197 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 15 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 7,70 m
Trackwidth return ?? m
Angle of wrap (drive wheel) 180 °
Drive altitude of site ?? m
Maximum capacity 3000 (3400) Pers/h
Travel time 5 min
Driving speed line 5 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer ??
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control ??
Remote control and telemonitoring system ??
Power control system ??
Number of drive 1 Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type electrical
Traction of drive direct drive
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type D5000
Cab manufacturer Doppelmayr
Cab model DCD 8
Bubble colour neutral
Seating leather
Seat heater yes
Persons per cab
Number of cabs ?? Stk
Cab distance ?? m
Cab interval ?? s
Garage type ground floor
Garage place valley station
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left
Construction costs 10,600,000  EUR 
Currency (Construction costs) Euro 
Construction period 7 months
Seasontime winter
Situation of entrance parallel
Situation of exit parallel
Loading carpet yes
Evacuation ropeway no
Integrated rescue system ??
Rope position control ??
Asset number (Trail map)




This information are for members only visible!





Support
Wrong data or something is missing?
Support us!
Updates
Datas: 19/05/20 08:44:06
PHOTOS: 18/01/20 12:33:42

Lift-Statistics
1496 visit(s) since 01/12/19
Last visit 20/09/20

LIFT-WORLD IDs
Lift-ID: 19021
Place-ID: 217

https://www.seilbahntechnik.net/en/lifts/19021/datas.htm