Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  8-CLD/B Fleidingbahn

Valley Station
Valley Station

Line
Line

Mountain Station
Mountain Station

General information  
Place Westendorf 
resort SkiWelt 
Region Tyrol 
Country   
Name of lift Fleidingbahn 
Type 8-CLD/B 
Lift manufacturer Doppelmayr 
Year of construction 2019 
Commissioning date 07/12/19 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

geometric data  
Height of valley station 1272 m
Height of mountain station 1869 m
Vertical rise 597 m
Route distance 1539,64 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 16 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2730 Pers/h
Travel time 4,82 min
Driving speed line 6,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Doppelmayr 
Remote control and telemonitoring system Doppelmayr 
Power control system Doppelmayr 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer ?? 
Cab model DCD 8 
Bubble colour neutral 
Seating ?? 
Seat heater yes 
Persons per cab
Number of cabs ?? Stk
Cab distance ?? m
Cab interval ?? s
Garage type ground floor 
Garage place valley station 
Garage direction forward 
Loading direction backward 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope ?? 
Tension type ?? 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left 
Construction costs ?? EUR
Currency (Construction costs) Euro 
Construction period 8 months
Seasontime winter 
Situation of entrance 90° 
Situation of exit 90° 
Loading carpet no 
Evacuation ropeway ?? 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) 117 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 11/03/24
PHOTOS: ??

Lift-Statistics
10454 visit(s) since 01/12/19
Last visit 21/12/24

LIFT-WORLD IDs
Lift-ID: 19022
Place-ID: 72

https://www.seilbahntechnik.net/en/lifts/19022/datas.htm