Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  8-CLD Reiterjoch

Valley Station
Valley Station

Line
Line

Mountain Station
Mountain Station

General information  
Place Obereggen 
resort Dolomiti Superski 
Region Trentino-South Tyrol 
Country   
Name of lift Reiterjoch 
Type 8-CLD 
Lift manufacturer Leitner 
Year of construction 2019 
Commissioning date 11 / 2019 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

geometric data  
Height of valley station 1852 m
Height of mountain station 2032 m
Vertical rise 180 m
Route distance 604 m
Horizontal length 600 m
Average incline ?? %
Largest incline ?? %
Number of pillars 7 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2400 Pers/h
Travel time 2,17 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) 662 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station 
Drive type electrical 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Leitner 
Cab model ?? 
Seating leather 
Seat heater no 
Persons per cab
Number of cabs 32 Stk
Cab distance ?? m
Cab interval ?? s
Garage type ground floor 
Garage place valley station 
Garage direction forward 
Loading direction backward 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope ?? 
Tension type ?? 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 000 %
Drive direction right 
Construction costs ?? EUR
Currency (Construction costs) Euro 
Construction period ?? months
Seasontime winter 
Situation of entrance parallel 
Situation of exit parallel 
Loading carpet yes 
Evacuation ropeway ?? 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) 23 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 25/02/23
PHOTOS: ??

Lift-Statistics
10770 visit(s) since 08/12/19
Last visit 27/12/24

LIFT-WORLD IDs
Lift-ID: 19024
Place-ID: 1495

https://www.seilbahntechnik.net/en/lifts/19024/datas.htm