Lift-Database

Lifts in the world


10-MGD zellamseeXpress I





Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

General information  
Place Zell am See
resort Schmittenhoehe

Region Salzburg
Country AT Austria, Österreich
Name of lift zellamseeXpress I 
Type 10-MGD 
Lift manufacturer Doppelmayr 
Year of construction 2018/19 
Commissioning date 07/12/19

geometric data  
Height of valley station 865 m
Height of mountain station 1115 m
Vertical rise 250 m
Route distance 535 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 6 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2800 Pers/h
Travel time 2,7 min
Driving speed line 6,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer ??
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 56 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope ??
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control ??
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station ??
Drive type ??
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type D5000
Cab manufacturer CWA
Cab model Omega IV-10 SI D
Seating leather
Seat heater yes
Heater no
Aircon no
Persons per cab 10 
Number of cabs 25 Stk
Cab distance ?? m
Cab interval ?? s
Garage type ground floor
Garage place valley and mountain
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction left
Construction costs ??  EUR 
Currency (Construction costs) Euro 
Construction period 14 months
Seasontime winter
Evacuation ropeway no
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) 18 




This information are for members only visible!



Updates
Datas: 03/03/20 17:29:42
PHOTOS: ????

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
713 visit(s) since 30/12/19
Last visit 29/03/20

LIFT-WORLD IDs
Lift-ID: 19034
Place-ID: 252

https://www.seilbahntechnik.net/en/lifts/19034/datas.htm