Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


6-CLD/B Brüggerhorn





Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

General information  
Place Arosa
resort Lenzerheide-Arosa
Region Grisons
Country CH Switzerland, Confoederatio Helvetica
Name of lift Brüggerhorn 
Type 6-CLD/B 
Lift manufacturer BMF 
Year of construction 2019 
Commissioning date 21/12/19

geometric data  
Height of valley station 2015,3 m
Height of mountain station 2447,37 m
Vertical rise 432 m
Route distance 1287 m
Horizontal length 1212,5 m
Average incline ?? %
Largest incline ?? %
Number of pillars 11 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1600 Pers/h
Travel time 4,68 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer ??
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 46 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope ??
Tension type ??
Tension way ?? m

electrical data  
Electrical control ??
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) 470,7 kW
Drive power (Operation) 394,7 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station
Drive type ??
Traction of drive ??
Emergency drive diesel engine
Traction of emergency drive ??

cabins data  
Grip type ??
Cab manufacturer ??
Cab model ??
Bubble colour neutral
Seating ??
Seat heater ??
Persons per cab
Number of cabs 42 Stk
Cab distance ?? m
Cab interval ?? s
Garage type ??
Garage place valley station
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction ??
Construction costs 8,000,000  CHF 
Currency (Construction costs) Swiss franc 
Construction period 8 months
Seasontime ❄ ☀ all-season
Situation of entrance ??
Situation of exit ??
Loading carpet ??
Evacuation ropeway ??
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 25/01/20 21:28:55
PHOTOS: ????

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
490 visit(s) since 31/12/19
Last visit 29/03/20

LIFT-WORLD IDs
Lift-ID: 19036
Place-ID: 68

https://www.seilbahntechnik.net/en/lifts/19036/datas.htm