Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


8-CLD/B Visnitz


Valley Station
Valley Station

Line
Line

Mountain Station
Mountain Station


Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

General information  
Place Samnaun
resort Silvretta Arena

Region Grisons
Country CH Switzerland, Confoederatio Helvetica
Name of lift Visnitz 
Type 8-CLD/B 
Lift manufacturer Garaventa 
Year of construction 2018/19 
Commissioning date 28/11/19

geometric data  
Height of valley station 2261 m
Height of mountain station 2633 m
Vertical rise 372 m
Route distance 1208 m
Horizontal length ?? m
Average incline 32,5 %
Largest incline 63 %
Number of pillars 13 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 7,70 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 3500 Pers/h
Travel time 4,53 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer Fatzer 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 52 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control Frey 
Remote control and telemonitoring system Frey 
Power control system Frey 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station
Drive type electrical
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type D5000
Cab manufacturer Doppelmayr
Cab model DCD 8
Bubble colour neutral
Seating ??
Seat heater yes
Persons per cab
Number of cabs 67 Stk
Cab distance ?? m
Cab interval ?? s
Garage type ground floor
Garage place valley station
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right
Construction costs 10,500,000  EUR 
Currency (Construction costs) Euro 
Construction period 7 months
Seasontime winter
Situation of entrance 90°
Situation of exit parallel
Loading carpet yes
Evacuation ropeway no
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) N2 




This information are for members only visible!





Support
Wrong data or something is missing?
Support us!
Updates
Datas: 05/06/20 15:25:50
PHOTOS: 18/01/20 17:17:08

Lift-Statistics
955 visit(s) since 03/01/20
Last visit 07/07/20

LIFT-WORLD IDs
Lift-ID: 19055
Place-ID: 7

https://www.seilbahntechnik.net/en/lifts/19055/datas.htm