Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


6-CLD Chattrix





Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

General information  
Place Saint-Nicolas-de-Véroce
resort
Region Rhône-Alpes
Country FR France
Name of lift Chattrix 
Type 6-CLD 
Lift manufacturer Poma 
Year of construction 2019 
Commissioning date 21/12/19

geometric data  
Height of valley station 1195,6 m
Height of mountain station 1547,8 m
Vertical rise 451,2 m
Route distance 1423,32 m
Horizontal length 1377 m
Average incline 33,59 %
Largest incline 81,62 %
Number of pillars 16 Stk
Greatest spanwidth 181 m
Max ground clearance ?? m
Trackwidth drive 4,8 m
Trackwidth line 6,1 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2650 Pers/h
Travel time 4,31 min
Driving speed line 6 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer ArcelorMittal 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 45 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control ??
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) 527 kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type electrical
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type LPA-M
Cab manufacturer Leitner
Cab model ??
Seating leather
Seat heater ??
Persons per cab
Number of cabs 64 Stk
Cab distance 44 m
Cab interval 8,0 s
Garage type none
Garage place nowhere
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill 30 %
Drive direction left
Construction costs 8,500,000  EUR 
Currency (Construction costs) Euro 
Construction period ?? months
Seasontime winter
Situation of entrance 90°
Situation of exit parallel
Loading carpet no
Evacuation ropeway no
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!





Support
Wrong data or something is missing?
Support us!
Updates
Datas: 30/05/20 20:18:22
PHOTOS: ????

Lift-Statistics
739 visit(s) since 05/01/20
Last visit 20/09/20

LIFT-WORLD IDs
Lift-ID: 19059
Place-ID: 1200

https://www.seilbahntechnik.net/en/lifts/19059/datas.htm