Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


6-CLD Col de l'Eychauda





Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

General information  
Place Monêtier
resort
Region Provence-Alpes-Côte d'Azur
Country FR France
Name of lift Col de l'Eychauda 
Type 6-CLD 
Lift manufacturer Poma 
Year of construction 2019 
Commissioning date 2019

geometric data  
Height of valley station 2166 m
Height of mountain station 2451 m
Vertical rise 285 m
Route distance 1477 m
Horizontal length ?? m
Average incline 19,2 %
Largest incline 59 %
Number of pillars 12 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 6,1 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2800 Pers/h
Travel time 4,1 min
Driving speed line 6,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer ??
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 46 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control ??
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type electrical
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type LPA
Cab manufacturer ??
Cab model ??
Seating leather
Seat heater no
Persons per cab
Number of cabs 70 Stk
Cab distance 46,29 m
Cab interval 7,7 s
Garage type ??
Garage place ??
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left
Construction costs ??  EUR 
Currency (Construction costs) Euro 
Construction period ?? months
Seasontime ??
Situation of entrance parallel
Situation of exit parallel
Loading carpet no
Evacuation ropeway no
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 05/01/20 15:15:41
PHOTOS: ????

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
288 visit(s) since 05/01/20
Last visit 29/03/20

LIFT-WORLD IDs
Lift-ID: 19060
Place-ID: 1137

https://www.seilbahntechnik.net/en/lifts/19060/datas.htm