Lift-Database » Lifts in the world
4-CLF Cibouït
Valley Station
Line
Mountain Station
General information | |
---|---|
Place | Monêtier |
resort | Serre Chevalier Vallée |
Region | Provence-Alpes-Côte d'Azur |
Country | |
Name of lift | Cibouït |
Type | 4-CLF |
Lift manufacturer | Poma |
Year of construction | 2019 |
Commissioning date | 12 / 2019 |
Second-hand lift. Formerly lift no. | 6589 |
Infos for handicapped persons |
---|
Sorry, no information available. |
Characteristics |
---|
Sorry, no information available. |
geometric data | |
---|---|
Height of valley station | 2147 m |
Height of mountain station | 2466 m |
Vertical rise | 319 m |
Route distance | 896 m |
Horizontal length | ?? m |
Average incline | 41,99 % |
Largest incline | 71 % |
Number of pillars | 9 Stk |
Greatest spanwidth | ?? m |
Max ground clearance | ?? m |
Trackwidth drive | ?? m |
Trackwidth line | 4,9 m |
Trackwidth return | ?? m |
Angle of wrap (drive wheel) | ?? ° |
Drive altitude of site | ?? m |
Maximum capacity | 1402 (1800) Pers/h |
Travel time | 6,5 min |
Driving speed line | 2,3 m/s |
electrical data | |
---|---|
Electrical control | Semer |
Remote control and telemonitoring system | ?? |
Power control system | ?? |
Number of drive | ?? Stk |
Drive power (Start) | 224 kW |
Drive power (Operation) | ?? kW |
Brake power | ?? kW |
Continuous brake power | ?? kW |
Driving station | Valley station |
Drive type | electrical |
Traction of drive | electromechanical |
Emergency drive | ?? |
Traction of emergency drive | ?? |
cabins data | |
---|---|
Grip type | ?? |
Cab manufacturer | Poma |
Cab model | ?? |
Seating | leather |
Seat heater | no |
Persons per cab | 4 |
Number of cabs | 76 (90) Stk |
Cab distance | 19,7 m |
Cab interval | 8,6 s |
rope data | |
---|---|
Rope manufacturer | ArcelorMittal |
Length of haul rope | ?? m |
Total weight of haul rope | ?? t |
Haul rope diameter | 40,5 mm |
Nominal strength of haul rope | ?? N/mm² |
Breaking strength of rope | ?? kN |
Tensionstation haulrope | Valley station |
Tension type | hydraulical (controlled) |
Tension way | ?? m |
miscellaneous data | |
---|---|
Transport uphill | 100 % |
Transport downhill | ?? % |
Drive direction | right |
Construction costs | ?? EUR |
Currency (Construction costs) | Euro |
Construction period | ?? months |
Seasontime | ❄ winter |
Loading carpet | yes |
Evacuation ropeway | no |
Integrated rescue system | ?? |
Asset number (Trail map) | ?? |
Updates
Datas: 04/10/24
PHOTOS: ??
Lift-Statistics
3426 visit(s) since 05/01/20
Last visit 05/10/24
LIFT-WORLD IDs
Lift-ID: 19061
Place-ID: 1137
https://www.seilbahntechnik.net/en/lifts/19061/datas.htm
Datas: 04/10/24
PHOTOS: ??
Lift-Statistics
3426 visit(s) since 05/01/20
Last visit 05/10/24
LIFT-WORLD IDs
Lift-ID: 19061
Place-ID: 1137
https://www.seilbahntechnik.net/en/lifts/19061/datas.htm