10-MGD Flégère





Infos for handicapped persons
Sorry, no information available.

Characteristics
First Doppelmayr Direct Drive in France

General information  
Place Chamonix
resort
Region Rhône-Alpes
Country FR France
Name of lift Flégère 
Type 10-MGD 
Lift manufacturer Doppelmayr 
Year of construction 2019 
Commissioning date 14/12/19

geometric data  
Height of valley station 1058 m
Height of mountain station 1890 m
Vertical rise 831 m
Route distance 2237 m
Horizontal length ?? m
Average incline 40,60 %
Largest incline 74,19 %
Number of pillars 12 Stk
Greatest spanwidth 312 m
Max ground clearance 61 m
Trackwidth drive 6,35 m
Trackwidth line 6,40 m
Trackwidth return 6,35 m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2000 Pers/h
Travel time 6,83 min
Driving speed line 6,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer Fatzer 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 58 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope 2661 kN
Tensionstation haulrope Valley station
Tension type ??
Tension way ?? m

electrical data  
Electrical control SEIREL 
Remote control and telemonitoring system SEIREL 
Power control system ??
Number of drive 1 Stk
Drive power (Start) ?? kW
Drive power (Operation) 945 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type electrical
Traction of drive direct drive
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type D5000
Cab manufacturer CWA
Cab model Omega V - 10
Seating leather
Seat heater ??
Heater ??
Aircon ??
Persons per cab 10 
Number of cabs 50 Stk
Cab distance ?? m
Cab interval ?? s
Garage type ground floor
Garage place valley station
Garage direction backward
Loading direction forward

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction right
Construction costs 20,500,000  EUR 
Currency (Construction costs) Euro 
Construction period ?? months
Seasontime ❄ ☀ all-season
Evacuation ropeway no
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!





Support
Wrong data or something is missing?
Support us!
Updates
Datas: 19/05/20 21:26:05
PHOTOS: ????

Lift-Statistics
895 visit(s) since 11/01/20
Last visit 20/09/20

LIFT-WORLD IDs
Lift-ID: 19073
Place-ID: 988

https://www.seilbahntechnik.net/en/lifts/19073/datas.htm