Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  8-MGD Gondelbahn Hochsöll










General information  
Place Soell 
resort ?? 
Region Tyrol 
Country   
Name of lift Gondelbahn Hochsöll 
Type 8-MGD 
Lift manufacturer Doppelmayr 
Year of construction 1988 
Commissioning date ?? 
Date of closing down 15/03/20 
Date of pull down 16/03/20 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

geometric data  
Height of valley station 737 m
Height of mountain station 1156 m
Vertical rise 419 m
Route distance 1882 m
Horizontal length ?? m
Average incline 23,10 %
Largest incline 62,00 %
Number of pillars 17 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2700 Pers/h
Travel time 6,3 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Elin 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type ?? 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type DS 108 
Cab manufacturer CWA 
Cab model OMEGA 8s 
Seating carpet 
Seat heater no 
Heater no 
Aircon no 
Persons per cab
Number of cabs 84 Stk
Cab distance ?? m
Cab interval ?? s
Garage type ground floor 
Garage place valley and mountain 
Garage direction backward 
Loading direction forward 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction right 
Construction costs ?? ATS
Currency (Construction costs) Austrian schilling 
Construction period ?? months
Seasontime ❄ ☀ all-season 
Evacuation ropeway no 
Integrated rescue system no 
Rope position control ?? 
Asset number (Trail map) 40 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 11/06/23
PHOTOS: ??

Lift-Statistics
25820 visit(s) since 07/08/03
Last visit 19/03/24

LIFT-WORLD IDs
Lift-ID: 1911
Place-ID: 80

https://www.seilbahntechnik.net/en/lifts/1911/datas.htm