Lift-Database » Lifts in the world

  6-CLD/B Schrattenwang

Valley station
Valley station

Tower 3
Tower 3

Tower 4
Tower 4

General information  
Place Oberstdorf 
resort Nebelhorn 
Region Bavaria 
Country   
Name of lift Schrattenwang 
Type 6-CLD/B 
Lift manufacturer Leitner 
Year of construction 2019 
Commissioning date 2019 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

geometric data  
Height of valley station 1279,6 m
Height of mountain station 1446 m
Vertical rise 166,4 m
Route distance 561,36 m
Horizontal length 532,2 m
Average incline ?? %
Largest incline 64,6 %
Number of pillars 7 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 6,1 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1680 (2000) Pers/h
Travel time 1,87 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) 315 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Leitner 
Cab model ?? 
Bubble colour neutral 
Seating ?? 
Seat heater ?? 
Persons per cab
Number of cabs 21 (26) Stk
Cab distance 54 m
Cab interval ?? s
Garage type station circulation 
Garage place mountain station 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 40 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope ?? 
Tension type ?? 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right 
Construction costs ?? EUR
Currency (Construction costs) Euro 
Construction period 4 months
Seasontime winter 
Situation of entrance 90° 
Situation of exit ?? 
Loading carpet no 
Evacuation ropeway no 
Integrated rescue system no 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 11/06/20
PHOTOS: ??

Lift-Statistics
6004 visit(s) since 02/02/20
Last visit 29/03/24

LIFT-WORLD IDs
Lift-ID: 19125
Place-ID: 152

https://www.seilbahntechnik.net/en/lifts/19125/datas.htm