Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


6-CLD Carreley


Valley Station
Valley Station

Line
Line

Mountain Station
Mountain Station


Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

General information  
Place Les Arcs
resort Paradiski
Region Rhône-Alpes
Country FR France
Name of lift Carreley 
Type 6-CLD 
Lift manufacturer Leitner 
Year of construction 2015 
Commissioning date ??

geometric data  
Height of valley station 1794 m
Height of mountain station 2388 m
Vertical rise 594 m
Route distance 1972 m
Horizontal length ?? m
Average incline 32 %
Largest incline 77 %
Number of pillars 18 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 6,1 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 3000 Pers/h
Travel time 5,47 min
Driving speed line 6,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer ??
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 48 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control ??
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) 779 kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type electrical
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type LPA
Cab manufacturer Leitner
Cab model ??
Seating leather
Seat heater no
Persons per cab
Number of cabs 97 Stk
Cab distance 43,2 m
Cab interval 7,2 s
Garage type ??
Garage place ??
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right
Construction costs 6,500,000  EUR 
Currency (Construction costs) Euro 
Construction period ?? months
Seasontime winter
Situation of entrance parallel
Situation of exit parallel
Loading carpet no
Evacuation ropeway no
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!





Support
Wrong data or something is missing?
Support us!
Updates
Datas: 22/04/20 22:12:33
PHOTOS: 10/04/20 20:06:33

Lift-Statistics
293 visit(s) since 08/04/20
Last visit 05/12/20

LIFT-WORLD IDs
Lift-ID: 19344
Place-ID: 1097

https://www.seilbahntechnik.net/en/lifts/19344/datas.htm