Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  4-CLD Treeline Cirque



General information  
Place Tahoe City 
resort Granlibakken 
Region California 
Country   
Name of lift Treeline Cirque 
Type 4-CLD 
Lift manufacturer Leitner-Poma 
Year of construction 2019 
Commissioning date 2019 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Middle-Station

geometric data  
Height of valley station ?? m
Height of mountain station ?? m
Vertical rise 315 m
Route distance 1650 m
Horizontal length 1521 m
Average incline ?? %
Largest incline ?? %
Number of pillars ?? Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2400 Pers/h
Travel time 6 min
Driving speed line 6,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station ?? 
Drive type ?? 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer ?? 
Cab model ?? 
Seating ?? 
Seat heater ?? 
Persons per cab
Number of cabs 115 Stk
Cab distance ?? m
Cab interval ?? s
Garage type ?? 
Garage place ?? 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope ?? 
Tension type ?? 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left 
Construction costs ?? USD
Currency (Construction costs) United States dollar 
Construction period ?? months
Seasontime ??  
Situation of entrance ?? 
Situation of exit parallel 
Loading carpet ?? 
Evacuation ropeway ?? 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 30/05/20
PHOTOS: ??

Lift-Statistics
2161 visit(s) since 09/04/20
Last visit 29/03/24

LIFT-WORLD IDs
Lift-ID: 19347
Place-ID: 2526

https://www.seilbahntechnik.net/en/lifts/19347/datas.htm