Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  10-MGD Grindelwald - Holenstein



General information  
Place Grindelwald 
resort Jungfrau 
Region Berne 
Country   
Name of lift Grindelwald - Holenstein 
Type 10-MGD 
Lift manufacturer Garaventa 
Year of construction 2019 
Commissioning date 14/12/19 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 942 m
Height of mountain station 1624 m
Vertical rise 680 m
Route distance 3099 m
Horizontal length ?? m
Average incline 24,9 %
Largest incline 77,7 %
Number of pillars 16 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1800 Pers/h
Travel time 8,7 min
Driving speed line 6,5 m/s
Driving speed station ?? m/s

electrical data  
Electrical control SISAG 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive 1 Stk
Drive power (Start) 974 kW
Drive power (Operation) 711 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type D5000 
Cab manufacturer CWA 
Cab model Omega V - 10 
Seating leather 
Seat heater no 
Heater no 
Aircon no 
Persons per cab 10 
Number of cabs 111 Stk
Cab distance ?? m
Cab interval ?? s
Garage type ground floor 
Garage place in all stations 
Garage direction forward 
Loading direction forward 


rope data  
Rope manufacturer Fatzer 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type ?? 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction left 
Construction costs ?? CHF
Currency (Construction costs) Swiss franc 
Construction period ?? months
Seasontime ❄ ☀ all-season 
Evacuation ropeway ?? 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 08/10/24
PHOTOS: ??

Lift-Statistics
4492 visit(s) since 29/04/20
Last visit 23/12/24

LIFT-WORLD IDs
Lift-ID: 19541
Place-ID: 1724

https://www.seilbahntechnik.net/en/lifts/19541/datas.htm