Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  4-CLF Plan de l'Eau

Valley station
Valley station

Line
Line

Mountain station
Mountain station

General information  
Place Val Thorens 
resort Les Trois Vallées 
Region Rhône-Alpes 
Country   
Name of lift Plan de l'Eau 
Type 4-CLF 
Lift manufacturer Montaz Mautino 
Year of construction 1988 
Commissioning date 1988 
Date of closing down 2014 
Date of pull down 2014 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 1815 m
Height of mountain station 2247 m
Vertical rise 432 m
Route distance 1258 m
Horizontal length ?? m
Average incline 37 %
Largest incline 73 %
Number of pillars 15 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1400 Pers/h
Travel time 9,1 min
Driving speed line 2,3 m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) 300 kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Montaz Mautino 
Cab model ?? 
Seating leather 
Seat heater no 
Persons per cab
Number of cabs 108 Stk
Cab distance 23 m
Cab interval 10 s


rope data  
Rope manufacturer Tréfileurope 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 40 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime winter 
Loading carpet no 
Evacuation ropeway no 
Integrated rescue system no 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 08/05/23
PHOTOS: ??

Lift-Statistics
9816 visit(s) since 07/11/03
Last visit 23/12/24

LIFT-WORLD IDs
Lift-ID: 1958
Place-ID: 1234

https://www.seilbahntechnik.net/en/lifts/1958/datas.htm