Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


10-MGD Planai I


valley station
valley station








Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

General information  
Place Schladming
resort

Schladming Dachstein Tauern
Ski amadé
Region Styria, Steiermark
Country AT Austria, Österreich
Name of lift Planai I 
Type 10-MGD 
Lift manufacturer Doppelmayr 
Year of construction 2019 
Commissioning date 06/12/19

geometric data  
Height of valley station 747 m
Height of mountain station 1351 m
Vertical rise 604 m
Route distance 1665 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars ?? Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 3800 Pers/h
Travel time 5,33 min
Driving speed line 6 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer ??
Length of haul rope 3800 m
Total weight of haul rope 44 t
Haul rope diameter 54 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope ??
Tension type ??
Tension way ?? m

electrical data  
Electrical control ??
Remote control and telemonitoring system ??
Power control system ??
Number of drive 1 Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type electrical
Traction of drive direct drive
Emergency drive diesel engine
Traction of emergency drive ??

cabins data  
Grip type D5000
Cab manufacturer CWA
Cab model Omega V - 10
Seating ??
Seat heater no
Heater no
Aircon no
Persons per cab 10 
Number of cabs 153 Stk
Cab distance ?? m
Cab interval ?? s
Garage type underground
Garage place Middle station(s)
Garage direction forward
Loading direction forward

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction ??
Construction costs 34,000,000  EUR 
Currency (Construction costs) Euro 
Construction period 7 months
Seasontime ❄ ☀ all-season
Evacuation ropeway ??
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!





Support
Wrong data or something is missing?
Support us!
Updates
Datas: 06/01/21 13:30:17
PHOTOS: 05/11/20 20:26:29

Lift-Statistics
2149 visit(s) since 04/05/20
Last visit 22/09/21

LIFT-WORLD IDs
Lift-ID: 19680
Place-ID: 240

https://www.seilbahntechnik.net/en/lifts/19680/datas.htm