Lift-Database » Lifts in the world
10-MGD Planaibahn I
General information | |
---|---|
Place | Schladming |
resort | ?? |
Region | Styria |
Country | |
Name of lift | Planaibahn I |
Type | 10-MGD |
Lift manufacturer | Doppelmayr |
Year of construction | 2019 |
Commissioning date | 06/12/19 |
Infos for handicapped persons |
---|
Sorry, no information available. |
Characteristics |
---|
Sorry, no information available. |
geometric data | |
---|---|
Height of valley station | 747 m |
Height of mountain station | 1351 m |
Vertical rise | 604 m |
Route distance | 1665 m |
Horizontal length | ?? m |
Average incline | ?? % |
Largest incline | ?? % |
Number of pillars | ?? Stk |
Greatest spanwidth | ?? m |
Max ground clearance | ?? m |
Trackwidth drive | ?? m |
Trackwidth line | ?? m |
Trackwidth return | ?? m |
Angle of wrap (drive wheel) | ?? ° |
Drive altitude of site | ?? m |
Maximum capacity | 3800 Pers/h |
Travel time | 5,33 min |
Driving speed line | 6 m/s |
Driving speed station | 1 m/s |
electrical data | |
---|---|
Electrical control | Doppelmayr |
Remote control and telemonitoring system | Doppelmayr |
Power control system | Doppelmayr |
Number of drive | 1 Stk |
Drive power (Start) | ?? kW |
Drive power (Operation) | ?? kW |
Brake power | ?? kW |
Continuous brake power | ?? kW |
Driving station | Mountain station |
Drive type | electrical |
Traction of drive | direct drive |
Emergency drive | diesel engine |
Traction of emergency drive | hydrostatic |
cabins data | |
---|---|
Grip type | D5000 |
Cab manufacturer | CWA |
Cab model | Omega V - 10 |
Seating | leather |
Seat heater | no |
Heater | no |
Aircon | no |
Persons per cab | 10 |
Number of cabs | 157 Stk |
Cab distance | ?? m |
Cab interval | ?? s |
Garage type | underground |
Garage place | Middle station(s) |
Garage direction | forward |
Loading direction | forward |
rope data | |
---|---|
Rope manufacturer | ?? |
Length of haul rope | 3800 m |
Total weight of haul rope | 44 t |
Haul rope diameter | 54 mm |
Nominal strength of haul rope | ?? N/mm² |
Breaking strength of rope | ?? kN |
Tensionstation haulrope | Valley station |
Tension type | hydraulical (controlled) |
Tension way | ?? m |
miscellaneous data | |
---|---|
Transport uphill | 100 % |
Transport downhill | 100 % |
Drive direction | right |
Construction costs | ?? EUR |
Currency (Construction costs) | Euro |
Construction period | 7 months |
Seasontime | ❄ ☀ all-season |
Evacuation ropeway | no |
Integrated rescue system | no |
Rope position control | yes |
Asset number (Trail map) | ?? |
Updates
Datas: 19/01/24
PHOTOS: ??
Lift-Statistics
8826 visit(s) since 04/05/20
Last visit 29/12/24
LIFT-WORLD IDs
Lift-ID: 19680
Place-ID: 240
https://www.seilbahntechnik.net/en/lifts/19680/datas.htm
Datas: 19/01/24
PHOTOS: ??
Lift-Statistics
8826 visit(s) since 04/05/20
Last visit 29/12/24
LIFT-WORLD IDs
Lift-ID: 19680
Place-ID: 240
https://www.seilbahntechnik.net/en/lifts/19680/datas.htm