Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


10-MGD Planai II





Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

General information  
Place Schladming
resort Ski amadé
Schladming Dachstein Tauern


Region Styria, Steiermark
Country AT Austria, Österreich
Name of lift Planai II 
Type 10-MGD 
Lift manufacturer Doppelmayr 
Year of construction 2019 
Commissioning date 06/12/19

geometric data  
Height of valley station 1351 m
Height of mountain station 1823 m
Vertical rise 472 m
Route distance 1643 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars ?? Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 3800 Pers/h
Travel time ?? min
Driving speed line 6 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer ??
Length of haul rope 3800 m
Total weight of haul rope 44 t
Haul rope diameter 54 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope ??
Tension type ??
Tension way ?? m

electrical data  
Electrical control ??
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station ??
Drive type ??
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type D5000
Cab manufacturer CWA
Cab model Omega V - 10
Seating ??
Seat heater yes
Heater ??
Aircon ??
Persons per cab 10 
Number of cabs 153 Stk
Cab distance ?? m
Cab interval ?? s
Garage type ??
Garage place ??
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction ??
Construction costs 34,000,000  EUR 
Currency (Construction costs) Euro 
Construction period 7 months
Seasontime ❄ ☀ all-season
Evacuation ropeway ??
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!





Support
Wrong data or something is missing?
Support us!
Updates
Datas: 04/05/20 20:25:40
PHOTOS: ????

Lift-Statistics
385 visit(s) since 05/05/20
Last visit 13/08/20

LIFT-WORLD IDs
Lift-ID: 19681
Place-ID: 240

https://www.seilbahntechnik.net/en/lifts/19681/datas.htm