Lift-Database » Lifts in the world
3-CLF North Wall
General information | |
---|---|
Place | Portage |
resort | Cascade Mountain |
Region | Wisconsin |
Country | |
Name of lift | North Wall |
Type | 3-CLF |
Lift manufacturer | Borvig |
Year of construction | 1985 |
Commissioning date | ?? |
Date of closing down | 2019 |
Date of pull down | 2019 |
Infos for handicapped persons |
---|
Sorry, no information available. |
Characteristics |
---|
Sorry, no information available. |
geometric data | |
---|---|
Height of valley station | ?? m |
Height of mountain station | ?? m |
Vertical rise | ?? m |
Route distance | 445 m |
Horizontal length | ?? m |
Average incline | ?? % |
Largest incline | ?? % |
Number of pillars | ?? Stk |
Greatest spanwidth | ?? m |
Max ground clearance | ?? m |
Trackwidth drive | ?? m |
Trackwidth line | ?? m |
Trackwidth return | ?? m |
Angle of wrap (drive wheel) | ?? ° |
Drive altitude of site | ?? m |
Maximum capacity | 1500 Pers/h |
Travel time | 3,5 min |
Driving speed line | 2,3 m/s |
electrical data | |
---|---|
Electrical control | ?? |
Remote control and telemonitoring system | ?? |
Power control system | ?? |
Number of drive | ?? Stk |
Drive power (Start) | ?? kW |
Drive power (Operation) | ?? kW |
Brake power | ?? kW |
Continuous brake power | ?? kW |
Driving station | ?? |
Drive type | ?? |
Traction of drive | ?? |
Emergency drive | ?? |
Traction of emergency drive | ?? |
cabins data | |
---|---|
Grip type | ?? |
Cab manufacturer | ?? |
Cab model | ?? |
Seating | ?? |
Seat heater | ?? |
Persons per cab | 3 |
Number of cabs | ?? Stk |
Cab distance | ?? m |
Cab interval | ?? s |
rope data | |
---|---|
Rope manufacturer | ?? |
Length of haul rope | ?? m |
Total weight of haul rope | ?? t |
Haul rope diameter | ?? mm |
Nominal strength of haul rope | ?? N/mm² |
Breaking strength of rope | ?? kN |
Tensionstation haulrope | ?? |
Tension type | ?? |
Tension way | ?? m |
miscellaneous data | |
---|---|
Transport uphill | 100 % |
Transport downhill | ?? % |
Drive direction | ?? |
Construction costs | ?? |
Currency (Construction costs) | ?? |
Construction period | ?? months |
Seasontime | ?? |
Loading carpet | ?? |
Evacuation ropeway | ?? |
Integrated rescue system | ?? |
Asset number (Trail map) | ?? |
Updates
Datas: 05/04/23
PHOTOS: ??
Lift-Statistics
1083 visit(s) since 26/10/20
Last visit 05/11/24
LIFT-WORLD IDs
Lift-ID: 19730
Place-ID: 2676
https://www.seilbahntechnik.net/en/lifts/19730/datas.htm
Datas: 05/04/23
PHOTOS: ??
Lift-Statistics
1083 visit(s) since 26/10/20
Last visit 05/11/24
LIFT-WORLD IDs
Lift-ID: 19730
Place-ID: 2676
https://www.seilbahntechnik.net/en/lifts/19730/datas.htm