Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  2-CLF Gefrorene Wand 3b

Valley station
Valley station

Valley station
Valley station

Valley station
Valley station

General information  
Place Hintertux 
resort Snow Card Tirol 
Region Tyrol 
Country   
Name of lift Gefrorene Wand 3b 
Type 2-CLF 
Lift manufacturer Doppelmayr 
Year of construction 1976 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 2970 m
Height of middle station(s) ?? m
Height of mountain station 3249 m
Vertical rise 279 m
Route distance 840 m
Horizontal length ?? m
Average incline 34,70 %
Largest incline 88,20 %
Number of pillars 11 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1110 Pers/h
Travel time 6,7 min
Driving speed line 2,5 m/s

electrical data  
Electrical control Elin 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type ?? 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Doppelmayr 
Cab model 2E Fix 
Seating Icolan 
Seat heater no 
Persons per cab
Number of cabs 127 Stk
Cab distance ?? m
Cab interval ?? s


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Mountain station 
Tension type rope tension weight 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction right 
Construction costs ?? ATS
Currency (Construction costs) Austrian schilling 
Construction period ?? months
Seasontime winter 
Loading carpet no 
Evacuation ropeway ?? 
Integrated rescue system ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 21/04/24
PHOTOS: ??

Lift-Statistics
19980 visit(s) since 31/12/02
Last visit 22/12/24

LIFT-WORLD IDs
Lift-ID: 1974
Place-ID: 20

https://www.seilbahntechnik.net/en/lifts/1974/datas.htm