Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  4-CLD Krimml X-press

Valley station
Valley station

middle station
middle station

Middle Station
Middle Station

General information  
Place Zell am Ziller 
resort ?? 
Region Tyrol 
Country   
Name of lift Krimml X-press 
Type 4-CLD 
Lift manufacturer Leitner 
Year of construction 1999 
Commissioning date 1999 
Date of closing down 16/04/23 
Date of pull down 08/05/23 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Middle station and curve station with entrance with curve of 90°.

geometric data  
Height of valley station 2053 m
Height of middle station(s) 2502 m
Height of mountain station 2405 m
Vertical rise 352 m
Route distance 2904 m
Horizontal length ?? m
Average incline 19,00 %
Largest incline 36,00 %
Number of pillars 28 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1800 Pers/h
Travel time 11,2 min
Driving speed line 4,5 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Siemens 
Remote control and telemonitoring system ?? 
Power control system Siemens 
Number of drive 2 Stk
Drive power (Start) ?? kW
Drive power (Operation) 750 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive diesel engine 
Traction of emergency drive hydrostatic 

cabins data  
Grip type ?? 
Cab manufacturer Leitner 
Cab model ?? 
Seating Icolan 
Seat heater no 
Persons per cab
Number of cabs 172 Stk
Cab distance 36 m
Cab interval 8 s
Garage type underground 
Garage place mountain station 
Garage direction forward 
Loading direction forward 


rope data  
Rope manufacturer Teufelberger 
Length of haul rope 5838 m
Total weight of haul rope ?? t
Haul rope diameter 42 mm
Nominal strength of haul rope 2160 N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way 6 m

miscellaneous data  
Transport uphill 100 %
Transport downhill 60 %
Drive direction left 
Construction costs ?? ATS
Currency (Construction costs) Austrian schilling 
Construction period 8 months
Seasontime winter 
Situation of entrance parallel 
Situation of exit 45° 
Loading carpet no 
Evacuation ropeway no 
Integrated rescue system no 
Rope position control yes 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 04/11/23
PHOTOS: ??

Lift-Statistics
27959 visit(s) since 08/01/03
Last visit 19/03/24

LIFT-WORLD IDs
Lift-ID: 2008
Place-ID: 64

https://www.seilbahntechnik.net/en/lifts/2008/datas.htm